Workplace design starts with occupancy: how many people, how often, and doing what. Desk ratios, meeting room mix and the amount of space given to collaboration follow from that, and getting it wrong is expensive in rent for years.

Reception is the part of a workplace that does the most work per square metre. It is where clients form their impression of the organisation, and it has to handle arrival, waiting and access control without feeling like a checkpoint.

Our workplace work includes contemporary offices and reception design in Beirut.

BIID design stages

  1. 1

    Feasibility & Design Concept

    The objective of this phase is to evaluate the conceptual design requirements of the project, prepare and present design concepts for preliminary review and approval.

  2. 2

    Spatial Coordination

    The design concept is more developed and drawn from the approved preliminary concepts presented. Documents are prepared which include initial space and furniture plans, lighting concepts, and concept for colors, materials and finishes, and the selection of ideal furnishings.

  3. 3

    Technical Information & Documentation

    This phase is an extension where all architectural documents and preliminary furniture specification are prepared for approval and implementation. The following will be drawn to be incorporated in an architectural documentation package. The plans submitted are not intended to be architectural permit plans, which would be submitted to the Building Reg department. They are to be used by the client, contractors for design intent, non-structural layout, and fixture locations only.

  4. 4

    Furniture, Fixture, Equipment & Materials Purchasing

    In this part of the phase we will create all the purchase orders for the FF&E and materials from the specifications written and issue and track vendor production. We will purchase all FF&E for the project.

  5. 5

    Project Administration

    Coordinate and review drawings with contractors.; Maintain project schedules.; Review all bids and pricing.

Workplace projects

Workplace Interiors — Frequently Asked Questions

Can you work with our existing building?

Yes — most workplace projects are fit-outs or refurbishments rather than new build, and the existing structure and services set the constraints.

Discuss a workplace project

Tell us the floor area, headcount and how the space needs to work.

What's included with Workplace Interiors

Occupancy and space planning study

Reception and client-facing area design

Meeting room and collaboration space mix

Acoustic, lighting and services coordination

FF&E specification and procurement